In March 2002, during a scheduled refueling outage, workers at FirstEnergy's Davis-Besse nuclear power plant found a football-sized hole in the reactor head caused by boric acid corrosion. Redundant shielding prevented any radiation leakage, but FirstEnergy projected the outage would last two to three months and cost from $15 million to $30 million. Instead, the outage lasted 26 months and cost $588.9 million. Students will learn the financial impact of the event, how investors reacted, and lessons in financial transparency.

Palabras clave:  Finance; Financial Transparency; nuclear power
Áreas:  Accounting and Control
Departamento:  Contabilidad y Control
Año de los hechos: Área geográfica:
Nº de páginas: 6 Fecha de publicación: 06/04/2009 Fecha de revisión: N/A Idioma: Inglés
Material complementario: DARDEN-C2234-E; DARDEN-C2233-E
Nota del instructor:


Si es usted profesor, contacte con IESEP para consultas gratuitas

* IVA y gastos no incluidos



** Debe adquirir un mínimo de 5 copias de todos los documentos, a excepción de notas del instructor.

Para visualizar los documentos que compre en IESE Publishing debe tener instalado Adobe Reader

MÁS DOCUMENTOS DE

ÚLTIMOS DOCUMENTOS SOBRE CONTABILIDAD Y CONTROL